Prospect Resources Expands Mumbezhi Copper Resource to 208.1Mt as Exploration Momentum Builds
Prospect
Resources Limited (ASX: PSC) has strengthened the growth outlook for its
Mumbezhi Copper Project in north-west Zambia after increasing the project’s
Mineral Resource Estimate to 208.1 million tonnes.
The
updated resource is reported at 0.42% copper and 0.49% copper equivalent,
containing approximately 877,100 tonnes of copper. The latest estimate
represents a 20% increase in resource tonnage compared with the February 2026
estimate, while contained copper increased by 14%. Contained gold also increased
significantly, adding further potential value to the project.
Three Deposits Support the Growing
Resource
The
expanded Mumbezhi resource comprises three main deposits: Nyungu Central,
Kabikupa and West Mwombezhi.
Nyungu
Central remains the largest component, with approximately
154.4Mt at 0.42% copper. Kabikupa contributes around 23.0Mt at 0.48% copper,
while West Mwombezhi adds approximately 30.7Mt at 0.37% copper. Importantly,
all three defined resources remain open along strike and down-dip, leaving room
for further exploration and potential resource growth.
The scale
of the resource provides Prospect with a substantial platform as it advances
technical studies and continues exploration across its large licence area.
West Mwombezhi Adds Further Copper
Potential
Exploration
at West Mwombezhi has also produced encouraging results. Diamond drilling has
identified continuous, near-surface copper sulphide mineralisation extending
for more than one kilometre.
Several
drilling intersections returned notable copper grades, including 8.9 metres at
0.78% copper from 54.6 metres, including 7.0 metres at 0.93% copper. Other
results included 6.7 metres at 0.57% copper and 5.8 metres at 0.44% copper.
Aircore
drilling has additionally identified two new copper anomalies west of the
existing West Mwombezhi resource, with both zones extending for more than one
kilometre.
Gold and Cobalt Could Add By-Product
Value
Prospect
is also assessing the potential contribution of gold and cobalt at Mumbezhi.
More than
2,800 existing copper drill-hole intersections were re-assayed for gold, with
results showing widespread gold mineralisation. Some of the strongest results
included 23.1 metres at 0.55 g/t gold and 29.0 metres at 0.22 g/t gold.
The
company believes these by-products could potentially provide
additional revenue streams and improve the economics of a future copper
operation.
Phase 3 Drilling Targets Further
Growth
Prospect
has commenced an expanded Phase 3 exploration programme covering approximately
26,000 metres of drilling. The programme includes diamond drilling, reverse
circulation drilling and scout aircore drilling.
The
campaign is targeting the Nyungu Hub, including Nyungu
Central, Nyungu West and Nyungu South, while also testing regional
prospects such as Chipimpa, Sharamba, Kamafamba, Kasombo, Shikezi and Chalamba.
With the
Mumbezhi resource continuing to expand and further drilling underway, Prospect
is positioning the project for its next stage of technical development. The
company is targeting completion of a Scoping Study in Q4 2026 or Q1 2027.
The
combination of a growing copper resource, additional exploration
targets and potential gold and cobalt by-products makes Mumbezhi an
increasingly important asset within Prospect Resources' portfolio.
%20Expands%20Mumbezhi%20Resource.png)
Comments
Post a Comment